|
|
|
Chang'an Grand Theater of BeijingIt costs RMB 20 million yuan on the renovation of stage machinery of the Chang’an Grand Theater. The elevator stage has been divided into three pieces, with a highest rising of 1.9 meters and a lowest descending of 3 meters below the stage. The renovation has greatly improved the technical specifications, safety factor and noise control of the Theater, which has reached the first-class domestic level or even the world level. SBS supplied all stage equipments and the full control system. |